Home
   
  Highway / Airport
  Concrete Plant
  Canal Construction
  Eagle Trenchers
  Specialized Equip
  Parts Sales
  Used Equip
   
  G&Z History
  Company News
  Paving School
  G&Z Facility
  Careers
  Guntert Steel
   
  Sales & Service
  Sales Reps.
   
  Highway/
Airport Equip
 
 
   
  ACPA
  Britpave
  AEM
  Con-Expo/Con-Ag
Project: East Bay Municipal Utility District, Oakland, California USA
Installation of 72" (1.82M) diameter sewage pipe.

Equipment: G&Z Self-Propelled Shredder/Backfill Processor for mixing kiln dust with wet, sticky native clay soil to produce friable backfill material at high production rates, 300-500 T/hr (272-453 Metric T/hr).

   
Stockpiled clay soil awaiting processing
Front end loader with side tilt bucket loads processor hopper (9 yd³)
 
Stockpiled processed material
   
End product
Processed backfill being compacted over pipe with backhoe equipped with a hoe-ram
 
Pricing
 

Pricing information can be obtained by contacting Guntert & Zimmerman directly.

Guntert & Zimmerman Const. Div., Inc.
222 East Fourth Street
Ripon, California 95366 U.S.A.
Phone: (209) 599-0066   Fax: (209) 599-2021