Home
   
  Highway / Airport
  Concrete Plant
  Canal Construction
  Eagle Trenchers
  Specialized Equip
  Parts Sales
  Used Equip
   
  G&Z History
  Company News
  Paving School
  G&Z Facility
  Careers
  Guntert Steel
   
  Sales & Service
  Sales Reps.
   
  Highway/
Airport Equip
 
 
   
  ACPA
  Britpave
  AEM
  Con-Expo/Con-Ag
The following form can be completed on-line and submitted via the Internet, or it can be printed, completed and returned by fax or mail.  If you are unable to print this form in its entirety, please contact us by E-mail, telephone or fax, and we will send you the complete form.
 

Information about your company is required before a quotation can be completed.  Please complete Section 20 to ensure receipt of a quotation.  If you have any questions about this form, please call (209) 599-0066, fax (209) 599-2021 or

Allow 7-10 working days (depending on complexity of equipment) for receipt of a quotation. 

Indicate how you would prefer the quotation to be sent:

Note:  If Drawings and Specifications are available, please send pertinent data to: 

222 East Fourth Street, Ripon, California 95366  USA or Fax to (209) 599-2021.
 
1.  Project Data
Project Name:

Location: 

Owner:
Contractor: 
Design Engineering Firm:
Equipment Port of Entry: 
Starting Dates:  Excavation:
Completion Date:  Pave:
 
2.  Total Length of Canal:
3.  Total Quantity of Concrete for Canal Lining: 
4.  Total Quantity of filter material underneath lining:
5.  Type of Soil:
6.  Will Rock be Encountered:
Maximum particle size: 
 

7. Canal Data: 
Please fill in the chart below with the information referenced by letter for each  section of canal.

 
        A B C D E F G H I

Sect
#

Section Length

Slope
y:x

Lining Thickness

+ Fill
- Cut
Height of Haul Road

Bottom Width

Curb Width

Canal Depth

Curb to Road

Haul Road Width

+ Fill
- Cut
Height of Haul Road

Curb to Road

Haul Road Width

1

2

3

4

5

 
8.  Miscellaneous Data:
A) Longitudinal Joints:
Specified Joint Sealant Type:
Location
B) Transverse Joints:
Specified Joint Sealant Type:
Location
 
9.   Type of Concrete Batching Plant
  Dry batching only       Central batching and mixing     Continuous
10. Capacity of Concrete Plant:
Theoretical Capacity/hr:
Experienced maximum capacity/hr:
Intended job average capacity/hr:
Maximum Distance from Batch Plant to Canal Lining Operation
   
11.   Capacity of hauling unit: 
Intended size of load to be hauled:
12.  Available clearance on each side of paver for:
Slipform crawler track line
RH
Feet (M)
LH
Feet (M)
Concrete haul road
RH
Feet (M)
LH
Feet (M)
 
13.  Intended concrete lining production per day:
14. Is ground water present in the canal bottom?
Yes    No 
Canal section/excavation area will be de-watered prior to canal construction:
Yes    No
Is a gravel or filter specified underneath the concrete lining?
Yes    No
15.  Haul road for concrete feed
On both sides of canal
On left side only
On right side only
16.  Spoil disposal area
On both sides of canal
On left side only
On right side only
 
17.  Minimum radius of turns (from canal centerline):
18.  Number and type of obstructions to move machines over: 
Intended moving method:
Maximum crane size available for use in your intended working area:
Tons (MT)
19.  Equipment Data
Equipment required:  (Check all that apply)
Fine Grader/Trimmer 
  Concrete Liner/Slipform
  Finish Jumbo
  Cure Jumbo
  Transverse PVC Joint Insertion Jumbo
20. Questionnaire completed by
Title

First Name

Last Name
Company Title
Company
Street Address
City
State
Postal Code
Country
Phone
Fax
Email
Comments
   
 
 
 
 
 
 
 
Guntert & Zimmerman Const. Div., Inc.
222 East Fourth Street
Ripon, California 95366 U.S.A.
Phone: (209) 599-0066   Fax: (209) 599-2021